The projects completed are listed below and can be accessed by scrolling down the page :


SHANGHAI SECCO PETROCHENICAL CO – SAR PROJECT, COMBUSTION FURNACE LINING

SUN METALS ZINC C0: LEACH IMPROVEMENT PROJECT

PORGERA GOLD MINE – AUTOCLAVE 1 RELINE

MURRIN MURRIN OPERATIONS – TRAIN 4 FLASH VESSEL 1 PARTIAL RELINE

SMC FINAL LEACH PROJECT

GORO NICKEL PROJECT – FLEATER VESSEL BRICK LININGS

GORO NICKEL PROJECT – CONCRETE PROTECTION


Project Reference

  SHANGHAI SECCO PETROCHENICAL CO – SAR PROJECT, COMBUSTION FURNACE LINING

 


                                                 

            


 

SCOPE OF WORK:

 

THE SCOPE OF THIS PROJECT WAS FOR THE DESIGN, SUPPLY AND INSTALLATION SUPERVISION OF REFRACTORY LINING SYSYTEMS TO A COMBUSTION FURNACE, CONSISTING OF A VERTICAL FURNACE, 8.8M DIA X 10M H, A HORIZONTAL FURNACE, 7M DIA X 13M H AND A WASTE HEAT BOILER.

APPROX. 800 TONS OF REFRACTORY MATERIALS WERE INSTALLED.

 .

LININGS USED:

 

MEMBRANE:   2 LAYERS CERAMIC PAPER IN POTASSIUM SILICATE SOLUTION

BRICKS:            BACK LAYER – 114MM THICK INSULATION BRICKS

HOT FACE LAYER – COMBINATION OF SUPREMA SA601 BRICKS (Andalusite) IN M602 MORTAR & SUPREMA KC90 BRICKS (Sintered Alumina) IN M901 MORTAR IN THE VERTICAL FURNACE AND SUPREMA B50 (Bauxite) IN M401 MORTAR IN THE HORIZONTAL FURNACE

 

LOCATION: SHANGHAI, CHINA                                   CLIENT: CTCI

 

DURATION:  12 WEEKS                                              COMPLETED:
FEB 05

 

 

PROJECT REFERENCE

 SUN METALS ZINC C0: LEACH IMPROVEMENT PROJECT

 



 

SCOPE OF WORK:

 

THIS PROJECT WAS FOR THE SUPPLY AND INSTALLATION OF ALL MEMBRANE AND BRICK LININGS TO 3 THICKENERS, 5 LEACH TANKS, 2 OVERFLOW TANKS AND THE ASSOCIATED SECOUNDRY CONTAINMENT AREAS.

THE TOTAL SURFACE AREA OF THE VESSEL INTERNALS WAS 2 800M2 AND THE SURFACE AREA OF THE CONTAINMENT AREAS WAS 3 000M2.

APPROX 640 TONS OF MATERIAL WAS INSTALLED

 

LININGS USED:

 

THICKENERS:                            MEMBRANE – OXYDUR UP410 SPRAY POLYESTER RESIN LAMINATE SYSTEM

                                                                BRICKS - 40MM ACID RESISTANT BRICKS LAID IN FURADUR FURANE RESIN MORTAR

LEACH & OVERFLOW VESSELS:   MEMBRANE – OXYDUR HT ELASTOMERIC POLYURETHANE LINING

                                                                BRICKS – 65MM ACID RESISTANT BRICKS LAID IN FURADUR RESIN MORTAR

FLOORS:                                               MEMBRANE – OXYDUR PTB/PTB-E ELASTOMERIC POLYURETHANE LINING SYSTEMS

TILES – 25 MM ACID RESISTANT TILES LAID IN OXYDUR TM POLYESTER RESIN MORTAR

 

LOCATION: TOWNSVILLE                               CLIENT: SUN METALS ZINC CORPORATION

 

DURATION: 5 MNTHS                                     COMPLETED: DEC 05

 

APPROX. VALUE: A$ 5.1 MILLION                 MANHOURS: 35 000

 


PROJECT REFERENCE

  PORGERA GOLD MINE – AUTOCLAVE 1 RELINE


 



SCOPE OF WORK:

 

SICP WAS SUBCONTRACTED TO DIDIER SAUREBAU TO SUPPLY PROJECT MANAGEMENT AND REFRACTORY BRICKLAYERS TO UNDERTAKE THE DEMOLITION OF THE EXISTING AUTOCLAVE 1 BRICK LINING AND FULL RELINE

THE CLAVE WAS CRITICAL TO THE CLIENTS PRODUCTION AND THE RELINE WAS DONE UNDER SHUTDOWN CONDITIONS WITH CREWS WORKING 24 HRS PER DAY, 7 DAYS A WEEK FOR THE PROJECT DURATION.

APPROX. 132 TONS OF MATERIAL WAS INSTALLED, INCLUDING MORE THAN 45 000 ACID RESISTANT BRICKS.

 

LININGS USED:

 

MEMBRANE:      LEAD LINING (BY OTHERS) + 2 LAYERS CERAMIC PAPER IN POTASSIUM SILICATE

BRICK LINING:   BACK LAYER – 25MM TILES IN STELLAKIT KG POTASSIUM SILICATE MORTAR

                                 MID LAYER – 65MM ACID BRICKS IN STELLAKIT KG MORTAR

                                FACE LAYER – 80MM ACID RESISTANT BRICKS IN STELLAKIT AE SODIUM SILICATE MORTAR

 

LOCATION: PAPUA NEW GUINEA                               CLIENT: DIDIER SAUREBAU GMBH

 

DURATION:  6 WEEKS                                                 COMPLETED: JULY 2007

 

APPROX. VALUE: A$ 725 THOUSAND                        MANHOURS: 11 000

 

PROJECT REFERENCE

 MURRIN MURRIN OPERATIONS – TRAIN 4 FLASH VESSEL 1 PARTIAL RELINE

 

 



                                                               
 

SCOPE OF WORK:

 

SICP WAS SUBCONTRACTED TO DIDIER SAUREBAU TO SUPPLY PROJECT MANAGEMENT, REFRACTORY BRICKLAYERS AND SKILLED LABOUR TO UNDERTAKE THE PARTIAL RELINING OF THE TRAIN 4 FLASH VESSEL # 1. SICP ALSO PROVIDED FULL LOGISTICAL SUPPORT SUCH AS MATERIALS HANDLING, POWER SUPPLY, CLIMATE CONTROL SYSTEMS ETC.

THE RELINE WAS DONE UNDER SHUTDOWN CONDITIONS WITH CREWS WORKING 24 HRS PER DAY, 7 DAYS A WEEK FOR THE PROJECT DURATION.

 

LININGS USED:

 

MEMBRANE:      STELLAGEN FUR FURANE LAMINATE LINING SYSTEM

BRICK LINING:   BACK LAYER – 80MM ACID RESISTANT BRICKS RESACID FQ MORTAR

                                 MID LAYER –  65MM ACID BRICKS IN RESACID FQ MORTAR

                                FACE LAYER –  80MM ACID RESISTANT BRICKS IN STELLAKIT KG MORTAR

 

LOCATION: LAVERTON, WESTERN AUSTRALIA          CLIENT: DIDIER SAUREBAU GMBH

 

DURATION:  3 WEEKS                                     COMPLETED: AUG 2007

 

APPROX. VALUE: A$ 330 THOUSAND                        MANHOURS: 4 000

 

PROJECT REFERENCE

 SMC FINAL LEACH PROJECT

 

 




 

SCOPE OF WORK:

 

 SUPPLY AND INSTALLATION OF ALL MEMBRANE AND BRICK LININGS TO 2 X 200M3 LEACH TANKS, 1 X 30M3 TANK, 1 X 60M3 TANK AND THE ASSOCIATED SECOUNDRY CONTAINMENT AREAS.

THE TOTAL SURFACE AREA OF THE VESSEL INTERNALS WAS 700 M2 AND THE SURFACE AREA OF THE CONTAINMENT AREAS WAS 629 M2.

A TOTAL OF 166 TONS OF MATERIAL WAS INSTALLED

 

LININGS USED:

 

ALL  VESSELS:     MEMBRANE – OXYDUR HT ELASTOMERIC POLYURETHANE LINING

                                BRICKS – 65MM ACID RESISTANT BRICKS LAID IN FURADUR RESIN MORTAR

FLOORS:               MEMBRANE – OXYDUR PTB/PTB-E ELASTOMERIC POLYURETHANE LINING SYSTEMS

                                TILES – 25 MM ACID RESISTANT TILES LAID IN OXYDUR TM POLYESTER RESIN MORTAR

 

 

LOCATION: TOWNSVILLE                                           CLIENT: SUN METALS ZINC CORPORATION

 

DURATION: 10 WEEKS                                                COMPLETED: OCT 07

 

APPROX. VALUE: A$ 750 THOUSAND                        MANHOURS: 6 000

 

 

PROJECT REFERENCE

 GORO NICKEL PROJECT – FLEATER VESSEL BRICK LININGS

 


 




 

SCOPE OF WORK:

 

THIS PROJECT WAS FOR THE INSTALLATION ONLY OF MEMBRANE AND ACID RESISTANT BRICK LININGS TO THE INTERNAL SURFACES OF 9 FLEATER (FLASH/HEATER VESSELS) VESSELS IN THE HPAL CIRCUIT

SICP PROVIDED PROJECT MANAGEMENT, REFRACTORY BRICK LAYERS AND ALL LABOUR AS WELL AS FULL LOGISTICAL SUPPORT SUCH AS THE PROVISON OF MATERIALS HANDLING EQUIPMENT, POWER SUPPLY, CLIMATE CONTROL SYSTEMS ETC.

342 TONS OF BRICKS WERE INSTALLED AND 1 100M2 OF STEEL SURFACE AREA WAS LINED WITH A FRP LAMINATE LINING SYSTEM

 

LININGS USED:

 

MEMBRANE:      STELLAGEN FUR FURANE LAMINATE LINING SYSTEM

BRICK LINING:   HT VESSELS – 3 LAYERS 80MM BRICKS IN STELLAKIT KG, POTASSIUM SILICATE MORTAR

IT VESSELS – 2 LAYERS 80MM BRICKS, BACKING LAYER IN STELLAKIT KG, WORKING FACE IN RESACID FQ

                                LT VESSELS – 1 LAYER 80MM BRICKS IN RESACID FQ MORTAR

 

LOCATION: NEW CALEDONIA                                    CLIENT: DIDIER SAUREBAU GMBH

 

DURATION: 10 MNTHS                                               COMPLETED: NOV 08

 

APPROX. VALUE: A$ 2.4 MILLION                             MANHOURS: 28 000


PROJECT REFERENCE

 GORO NICKEL PROJECT – CONCRETE PROTECTION

 

 

SCOPE OF WORK:

 

THIS PROJECT INVOLVED THE SUPPLY AND INSTALLATION OF VARIOUS LINING SYSTEMS TO PROVIDE PROTECTION TO THE CONCRETE SURFACES OF SECOUNDRY CONTAINMENT AREAS IN THE CHEMICAL PROCESSING SECTIONS OF THE REFINERY. SICP PROVIDED FULL LOGISTICAL SUPPORT FOR THIS CONTRACT INCLUDING THE PROVISION OF PROJECT MANAGEMENT, QUALITY ASSURANCE, SUPERVISION, SKILLED LABOUR, ALL CONSTRUCTION EQUIPMENT AND THE SHIPPING OF ALL MATERIALS AND EQUIPMENT TO THE PROJECT SITE.

IN TOTAL A SURFACE AREA OF OVER 38 000M2 WAS COVERED WITH ELASTOMERIC EPOXY AND POLYURETHANE LININGS IN 18 SEPARATE PLANT AREAS.

A TOTAL OF 370 TONS OF LINING MATERIALS WERE DELIVERED AND INSTALLED

 

LININGS USED:

 

GENERAL AREAS:                             OXYDUR PTB/PTB-E ELASTOMERIC POLYURETHANE LINING SYSTEMS

SOLVENT EXTRACTION AREAS:   ALKADUR HR ELASTOMERIC EPOXY LINING SYSTEM

SULPHURIC ACID AREA:                OXYDUR UP82/UP82-E MEMBRANE TOPPED WITH DS25 TILES BEDDED AND POINTED                                                      IN FURADUR CEMENT MORTAR

 

LOCATION: NEW CALEDONIA                                    CLIENT: GORO NICKEL SLN

 

DURATION: 18 MNTHS                                               COMPLETION: DUE MARCH 09

 

APPROX. VALUE: A$ 10.6 MILLION                           MANHOURS: 38 000